Overview
This article covers how to set up the AppWright integration for a market and how to disable it on individual tasks when needed.
Set Up the Integration
Set Up the Integration
To establish the AppWright integration for a market, gather the following information before submitting a support ticket:
Product Category. Determine which product categories need integration. Available options include Floor Systems / EWP, Floor Truss, READY-FRAME, Roof Truss, and Wall Panels.
Team Selection. Select the team under the product category to connect with the integration. Choose a simple team name (for example, "Market Name Design").
Truss Plant. Identify which truss plant the market uses.
After gathering this information:
Submit a help desk ticket using the "I have a question" option.
Include the three data points above in the ticket description.
The Support Team will follow up to complete the integration setup. The timeline depends on the market's complexity.
Disable a Task Connection
When an AppWright-enabled task is removed from myBLDR, the link to the AppWright job is removed, but the job remains in AppWright and is not deleted.
To disable the AppWright integration on a task:
Go to the Quote Tasks module.
Select the X on the product to remove. The link to the AppWright job is removed from myBLDR.
Note: The integration can be re-enabled on the same task and will reconnect to the original AppWright job. To re-enable, add the product category back to the quote task and turn on the integration toggle. |
The link to the AppWright job is removed from myBLDR.
myBLDR task removal notification

